Most quotes for custom metal gifts are not comparable, and the reason is rarely the factory’s honesty. Two enquiries describe two different products and two different scopes of work, so the gap between two prices measures the gap between the scopes rather than any difference in competence. A complete request for quotation removes that ambiguity before the first price comes back. This guide sets out the fields that make metal gift quotations comparable and gives a template you can copy into your next enquiry.

Why two enquiries for the same product return different prices
A metal souvenir quotation is a price for a bundle of decisions, and most of those decisions are not written down. The price covers a particular alloy, a particular size, a particular plating finish, a particular quantity of packaging, a particular level of inspection, and a particular number of sample rounds. When an enquiry leaves any of those open, the factory has to assume something, and the assumption becomes part of the price. Two buyers then receive two different numbers for what they believe is the same item, and the only honest conclusion either can draw is that the quotes cannot be compared.
This is not a China-specific problem, and the buying frameworks used for public procurement in the United States recognise it. The Federal Acquisition Regulation’s uniform contract format at FAR 15.204-1 prescribes what a solicitation document must contain, section by section, so that bidders respond to the same set of instructions and the resulting proposals can be evaluated against each other. The structure is developed for government contracting, but the principle transfers directly to a private metal gift enquiry. The rest of FAR Part 15 covers the surrounding process, and even a buyer with no intention of using government contracting will recognise the shape of the problem. The buyer defines the requirement precisely, the supplier responds against the same requirement, and the responses are assessed against the stated criteria rather than against impression.
The twelve fields that make metal gift quotations comparable
The fields below are the ones that change the number most often. Each is stated with what it is for and what happens when it is missing, so the list can be used as a specification checklist rather than a form to fill in blindly.
| Field | What it specifies | What happens when it is missing |
|---|---|---|
| 1. Product category and end use | Whether the item is a fridge magnet, keychain, bottle opener, medallion, coin, spoon or photo frame | The factory assumes a standard construction. Categories differ in wall thickness, fixings and packaging, so the assumption decides the price |
| 2. Dimensions and weight | Length, width, height and net weight of the finished piece | Cost is driven by material volume, and differences of this kind are among the largest a quotation can hide |
| 3. Material | Zinc alloy as the default, with stainless steel, brass, bronze or iron where required | Material changes raw stock cost, tooling wear, weight, corrosion behaviour and finishing options. It cannot be left to the supplier |
| 4. Design source and file format | Whether you supply a 3D file, a 2D drawing, a reference image or nothing, and in what format | Design work moves into or out of the quotation silently. Quoting from an image is a different scope from quoting from a model |
| 5. Decoration processes | Laser engraving, screen printing, embossing, debossing, molded logo, enamel colour fill, or a combination | Decoration is priced per process. “With logo” may be answered with an engraving quote when you assumed an enamel-filled relief |
| 6. Plating and finish | Gold, silver, rose gold, antique brass, antique silver, antique copper, black nickel, dual tone, or polished and lacquered, plus any colour reference | Finish is a large share of the cost and the part most often varied. Colour references must be stated as a standard, not a description |
| 7. Quantity, in tiers | The actual order quantity and the tier it falls into | Minimum order quantity is the most common cause of a mismatch between expectation and quotation |
| 8. Tooling and its ownership | Whether a new tool is needed, and who owns it and pays for maintenance afterwards | A tooling charge in one quotation and not another looks like a price difference when it is a scope difference |
| 9. Sampling rounds and approval | How many sample rounds are needed before production, and what each costs | Sample charges and lead time get interpreted differently, and repeated rounds turn into an unexpected cost |
| 10. Packaging | Whether goods are bulk packed, bagged, carded, blister packed or boxed, and who supplies the packaging | Packaging can add more cost than the metal in the piece, and it is frequently omitted from the brief |
| 11. Inspection and testing requirements | What is checked, by whom, to what standard, and whether third-party inspection is required | Scope affects price and delivery date, and “no inspection specified” is read in different ways |
| 12. Delivery terms, destination and target date | The Incoterm, the destination address, and the date the goods must arrive | Without a term, the quotation may or may not include freight and export handling, and no working-back schedule can be built |
Two rows deserve emphasis. Field 3 decides raw stock cost, tooling wear and finishing options together, and a factory is entitled to quote zinc alloy when the brief is silent. Field 8 looks like a price difference and is not: a tooling charge present in one quotation and absent in another usually means the two suppliers priced different scopes.
Fields 1 to 4: what the product is
Construction differs by category. A flat souvenir fridge magnet and a three-dimensional keychain are built differently even when they share a theme, and the difference in tooling, fastening method and packing is real.
Give dimensions in millimetres with a tolerance, and state a target weight if you have one, because weight is a shipping constraint as well as a cost driver. A buyer who knows the piece must fit a display card can state the card rather than discover the mismatch after the tool is cut.
Material is a decision, not a default. Zinc alloy is the workhorse for cast metal gifts, with stainless steel, brass, bronze and iron used where the brief calls for them. Stating it means the quotation is priced on the material you want, not the one the factory would have chosen. If you are unsure, ask for the assumption to be stated, so a second supplier is compared against the same one.
Design source changes who does what. With a dimensioned 3D file the factory is pricing production. With a reference photograph it is pricing design work as well. With nothing it is pricing design, sampling and production, and the quotation should say so. Each position is legitimate, and quotations are comparable only when the position is stated.

Fields 5 and 6: decoration and finish
Decoration and plating are where two otherwise identical enquiries most often diverge, because both are multi-option and both are described loosely. The available logo processes on metal gifts include laser engraving, screen printing, embossing, debossing, a logo molded into the casting, and enamel colour fill. Each gives a different visual result, a different unit cost and a different minimum quantity, so an enquiry naming one process and a quotation quoting another are not comparable.
State the process and the artwork for each. For a piece carrying both an engraved logo and an enamelled landmark, say which artwork belongs to which, so the factory quotes the two operations separately, which also makes the invoice checkable.
Finish needs the same treatment. Plating options include gold, silver, rose gold, antique brass, antique silver, antique copper, black nickel and dual tone, alongside polished and lacquered finishes. Attach a colour reference if one exists. If not, and the finish is an antique or dual tone, ask for a photograph of the approval sample, because antique tones vary in how dark they read and in how the highlight sits on raised areas. That photograph closes the loop before production at no cost beyond the approval round you would run anyway.
Sequencing is worth asking about explicitly. Decoration applied before plating and decoration applied after plating are different operations with different risks, and a factory that plates after engraving needs to say how it protects the engraved surface. That question belongs in the enquiry, because the answer determines whether the marking survives to the customer.
Fields 7 to 9: quantity, tooling and samples
Quantity is where tiering does the work. Minimum order quantities are structured in bands because the fixed costs of a production run spread across a different number of pieces at each level. In zinc alloy die casting, a first order against an existing tool can start at 100 pieces, a standard design on an existing tool typically starts at 500, and a fully custom casting for most designs starts at 1,000. A quotation at one band is not a quotation at another, so the enquiry states the quantity and the factory confirms the band it has priced.
Tooling needs its own line. State whether the design needs a new mould or fits an existing one, and if new, ask what the tooling charge is, what it covers and who owns it. Tooling ownership links directly to the questions that determine whether you can take the design to another supplier later. Buyers weighing a supplier against the alternatives should work through how to choose a metal gifts manufacturer, and the quantity bands themselves are set out on our MOQ page.
Samples should be specified as a number of rounds with a cost and a lead time for each, and with a named approval point. Our sampling lead time is 7 days and production runs 15 to 20 days after approval, so a plan with two sample rounds and a fixed shipping date needs the rounds counted explicitly.
Fields 10 to 12: packaging, inspection and delivery
Packaging deserves its own field because it is often the largest non-metal component of a landed cost. Bulk packing, polybags, header cards, blister cards and printed boxes are all different, and so is who supplies the material. A printed box needs artwork, print lead time and possibly its own print run minimum, which is a project inside the project. Our metal gift packaging guide covers the options.
Inspection should say what is checked, against what, and by whom. For metal gifts this typically covers dimensions, surface finish, plating colour, decoration placement and functional checks where the item has a moving part. Some buyers need third-party inspection, and independent inspection bodies such as Intertek provide it against an agreed scope. If your quality system requires it, say so in the enquiry, because an inspection booked at the factory is priced differently from one booked independently.
Delivery needs a term, a destination and a date. The International Chamber of Commerce publishes the Incoterms rules that assign cost, risk and responsibility between buyer and seller, and stating the term removes the largest single ambiguity in a landed cost. For metal gifts produced for a retail chain, the identification data the chain requires also matters, including the barcode format its systems read. GS1 issues the Global Trade Item Numbers those systems are built around, and stating the requirement early avoids a re-pack of finished goods.

A copy-and-send RFQ template
Every line below maps to one of the twelve items. Copy it into an email, replace the bracketed text, and delete the lines that do not apply. A short, complete enquiry beats a long one, and an incomplete enquiry is worse than a short one because it produces a number that cannot be compared.
Subject: RFQ for custom metal — [quantity] pcs, target delivery [date]
1. Product and end use
[Product category, e.g. 3D metal souvenir fridge magnet / bottle opener keychain / medallion]. This is for [retail chain, museum shop, promotional giveaway, club].2. Dimensions and weight
[L x W x H in mm], target net weight [g]. It must fit [display card / envelope / box size] and the packaged size must not exceed [dimensions] for [shipping method].3. Material
[Zinc alloy / stainless steel / brass / bronze / iron]. Please quote [alternative] as a separate line so we can compare.4. Design
[We will send a 3D file in STEP format / a dimensioned 2D drawing / reference images only / no design file yet]. Design files attached: [yes / no]. If no file is attached, please state whether your quotation includes design work and what it costs.5. Decoration
[Laser engraving of the logo on the reverse / screen print / embossed / debossed / molded logo in the casting / enamel colour fill of the [landmark] area]. Artwork attached for each process: [yes / no]. Please quote each process separately.6. Finish
[Polished then plated in gold / silver / rose gold / antique brass / antique silver / antique copper / black nickel / dual tone], or [polished and lacquered]. Colour reference attached: [yes / no]. Please state the base metal and the plating process in the quotation.7. Quantity
[Quantity] pcs, split as [shipment plan if any]. Please quote [Quantity x 2] as well so we can see the band effect.8. Tooling
A new mould is required / the design can use an existing tool. If new: tooling charge [known amount or “please quote”], what it covers, and please state who owns the mould and who pays for maintenance after the order.9. Samples
We need [number] sample rounds before production. Please quote the sample charge and the lead time per round, and state what can be changed in each round.10. Packaging
[Bulk in cartons / polybag / header card / blister card / printed box], packaging supplied by [us / you]. Barcode required: [yes / no, GTIN format / no]. If packaging material is supplied by us, please state the artwork format and lead time you need.11. Inspection
[Dimensions, surface finish, plating colour, decoration placement, function / no inspection other than your standard process]. [Third-party inspection required / not required]. Please state the inspection cost and the booking lead time if applicable.12. Delivery
Incoterm [EXW / FOB / CIF / DDP, state the named place], destination [address and city and country], target arrival date [date], or [we will confirm after quotation].Additional notes
[Any quality standard, certification requirement, packaging artwork, or reference samples to follow.]
Please return the quotation broken down as: unit price by quantity band / tooling charge / sample charge / decoration cost / finish cost / packaging cost / inspection cost / freight basis.
Two features are worth calling out: breaking the unit price into components shows which line is thin and makes a second supplier’s response comparable line by line, and quoting a second quantity band turns a single data point into a curve so you can see whether the factory’s tiering matches your expectation before you commit.
Questions buyers ask about writing an RFQ
How many fields are really needed for a first enquiry?
The twelve above are the complete set, but a first exploratory enquiry for a standard product can be shorter. Category, dimensions, material, finish, quantity, packaging and delivery term will usually produce a workable indicative quote. New tooling, certification and complex decoration need the rest.
Should I ask for a price before I have final artwork?
Yes, provided the enquiry says the artwork is provisional. One product design with the logo and decoration processes stated is enough to compare suppliers. State that the price is indicative until the artwork is fixed, otherwise the factory may quote an allowance that later disappears.
How many suppliers should I ask?
At least three, using the same enquiry document. The point is not to take the lowest number but to see which parts of the specification different factories priced differently, because those are where your brief was ambiguous. Where three quotations agree closely on a line, that line is probably well specified; where they diverge, that is where you will find an unaccounted cost.
What if the supplier asks for a deposit before quoting?
A refundable sample charge is normal, because samples cost material and machine time. A tooling deposit before the design is agreed belongs after the drawing is approved. Our guide to custom metal gift pricing walks through the cost structure, and HS codes and Incoterms covers the customs side.
What should I not put in the enquiry?
Nothing confidential before a supplier is under an NDA, and no ambiguity about who owns the design. Both belong in a written agreement at the point where the design file is shared.
How long should I expect a quotation to take?
It depends on whether artwork is ready and whether new tooling is needed. Pricing a standard product on an existing tool needs little information. A fully custom design with new tooling, colour references and certification is a longer exchange, and the first reply may be a request for information rather than a price. That request is itself informative: it tells you whether the factory understood the brief.
The pattern is simple. A complete enquiry gets a quotation as its first reply; an incomplete enquiry gets a question. Twelve fields get you a number in one round, four fields get you a conversation that may take three rounds to reach the same place.